This, together with the road I/64 and streams Rajčianka bridges industry consulting group and eleva


One of the strategic objectives of the Slovak Republic in the European integration process is the connection of transport links of Slovakia to the European transport network. The proposed highway D1 in section HričovskébPodhradie - Dubna Skala is in line with the "Programme of development industry consulting group of the road network Slovenskejbrepubliky" as well as with Government Resolution no. 882/2008 to report on the implementation of the training program industry consulting group and the construction of highways and expressways.
The present section of the D1 motorway is part of the transport corridor. The modified branch in Slovakia and, in the route Bratislava - Trenčín - Žilina - Košice - Line SK / UA. It is this part of the main section of the D1 motorway in Slovakia. Currently, all the traffic in that section made by road I/18 and I/64. Communication have largely unsatisfactory safety and capacity parameters. This condition causes difficulty maneuvering capabilities and limitation of the flow of traffic, increased accidents and environmental degradation. The package Hričovské Podhradie - Dubna Skala such works are: D1 Hričovské Podhradie - Lietavska Lucka with a length of 11.3 km, D1 Lietavska Lucka - cherry with a length of 5.4 km, D1 cherry - Dubna Skala with a length of 8.1 kilometers, linking the path I/64 feeders industry consulting group Lietavska Luck - Zilina with a length of 4.25 km.
LOCALIZATION ENGINEERING building is located in the region of Žilina Žilina district and connects the municipalities Hričovské Podhradie, Lower Hričov, Ovčiarsko, Bitarová hot Brezany, Bánová, Lietavská Lucka, Bytčica, Porubka, Turin, Rosina, Vrutky and cherry. Construction begins in Vah basin: Lower Hričov motorway junction is connected to D1 and D3. Bridges goes over the edge of the village of Lower Hričov and I/18. Continues through the top of the tunnel Brieška Ovčiarsko, further down the valley slopes and stream Bitarová Zilina tunnel entrance to the valley and the village Rajčianka Lietavska Lucka.
This, together with the road I/64 and streams Rajčianka bridges industry consulting group and elevated industry consulting group highway continues along the eastern edge of Žilina Basin. The whole area is a route cruising hills and hardly accessible valleys, on which are found the landslide area with different activities (the active forms to stabilized landslides), and therefore the route or hedged anchored retaining wall, or is conducted on bridges. Dominant object industry consulting group of this section industry consulting group is 7,500 m long tunnel under the peak of cherry Lučanská Fatra. After geological site comes mostly granodiorite of crystalline rocks. The entire route of the tunnel industry consulting group there is a considerable amount of faults.
Line segment ends at the eastern portal of the. account. Vrútky branches industry consulting group intersection Dubna Skala linking D1 to travel to and from I/18 Martin. Ovčiarsko industry consulting group tunnels - the tunnel is designed with two parallel tunnel tubes, one at 2348 mA second with a length of 2,353 meters. Within the engineering-geological survey exploratory tunnel was built. Ventilation industry consulting group is longitudinally jet fan mounted below the ceiling of the tunnel tube. In order to ensure the possibility of escape in the event of an accident is proposed eight cross passages, and 5 links for pedestrians and 3 connections for vehicles.
Zilina - tunnel is designed with two parallel tunnel tubes with lengths of 684 mA 687 m. Ventilation is longitudinally jet fan mounted below the ceiling of the tunnel tube. In the event of an accident in a tunnel secured two cross passages for pedestrians. Cherry - tunnel industry consulting group is designed with two parallel tunnel tubes with lengths of 7520 mA 7484 m. Within IGHP exploratory tunnel was built. Ventilation is designed laterally, where exhaust and supply air is guided over medzistropnou board air channel. Ventilation has three sections, industry consulting group where 1 and 3 stretch ventilation is provided through the portal sections VP and ZP, 2 section is provided via a ventilation shaft. Ventilation shaft is long at 102 mA resulting field. To ensure a leak in the event of an accident is proposed 13 cross passages to escape pedestrians and 12 cross passages for vehicles. Heliport LZS is built to ensure the prompt removal industry consulting group of the wounded. The building is situated industry consulting group at a distance of 200 m from the western portal and south of the village of cherry. The proposed area is a circle with a diameter of 21.3 mA is designed to accommodate industry consulting group the largest size-chopper (Mi8/Mi17). Hard surface is associated with the highway communication handler. The road is asphalt. The lower intersection Hričov - planned completion incumbent intersection Spooler lane direction D1 to D3 Zilina Martin and Martin connection direction D1 to D3 Zilina, guard. This will allow connection to the Czech Republic and Poland without collisions. Intersection will be connected to the Zilina trip to the airport. Lietavska Lucka (Zilina south) - The proposal consists of 10 branches junctions to ensure coherence of the D1 motorway feeder road network through the road I/64 directions to Zilina and Rajec Dubna Skala - planned to build. It consists of two interconnected branches serving